6-12 Week Lead Time

Nationwide Delivery

Finance Available

Drake

8.0 m × 3.0 m · 26 ft × 10 ft

24 m² · 260 sq ft

A larger single-module office providing generous workspace for growing teams, management offices or client-facing operations.

Team WorkspaceOfficeSales Office
Built to last — steel frame
Fully insulated · all year round
Nationwide delivery
PVC lino flooring
Double-glazed windows & doors
4 roof hooks for relocation
£18,999

inc. VAT & delivery

Price = base unit. WC, kitchen & AC available - see details.

Layout & design

BUILD YOUR INTERIOR

Choose the rooms and extras you need. Your total updates as you select.

STEP 1 – MODEL
STEP 2 – OPTION
WC ROOM — choose one, or skip
Walls & door only Walls & door only Room 1.5 m × 1.5 m (5 ft × 5 ft) · partition walls · door · ventilation grille · no white installation £800
Toilet, basin & plumbing Toilet, basin & plumbing ★ 1 × WC · 1 × wash basin · 1 × mixer tap · 1 × under-sink electric water heater · full plumbing & connections £1,650
KITCHEN — choose one, or skip
Compact kitchen Compact kitchen ★ Base & wall cabinets · worktop · sink with mixer tap · water heater · plumbing · sockets · built-in fridge · 1.3 m × 0.6 m × 0.85 m (4.5 ft × 2 ft × 3 ft) run · ideal for offices £1,000
Full kitchen Full kitchen Full-length base & wall cabinets · worktop · sink with mixer tap · water heater · plumbing · sockets · built-in fridge · 2.7 m × 0.6 m × 0.85 m (9 ft × 2 ft × 3 ft) run £2,500
OFFICE / MEETING ROOM — choose one, or skip
Walls & door only Walls & door only 3.0 m × 3.0 m · partition walls · door · standard finish £1,200
With sockets & lighting With sockets & lighting Shell + sockets · LED lighting · LVT floor upgrade £1,600
CLIMATE CONTROL — choose one, or skip
Air conditioning — 3 kW Air conditioning — 3 kW Wall-mounted unit · heating & cooling · year-round comfort · supplied and installed £1,250
Electric radiator — 1 kW Electric radiator — 1 kW Electric wall-mounted panel radiator · supplied and installed £90

Your Total

£0

£0

Configuration

Request This Quote

We respond within 24 hours. Your details are never shared.

Interested in a Unit?

Enquire Now.
We Respond
Same Day.

Interested in this unit? Tell us how you’d like to proceed and we’ll confirm availability, answer any questions, or arrange viewing or delivery.

Enquire About This Unit

We respond within 24 hours. Your details are never shared.

Scroll to Top

BTP – Braydon Trailers — Workspace 72

12.0 m × 6.0 m · 39 ft × 20 ft

72 m² · 775 sq ft

Modules: 4

Finish: Metal cassette cladding

Use: Office

Location: Swindon

Date: 2025

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

Newgate Civil Engineering — Workspace 72

12.0 m × 6.0 m · 39 ft × 20 ft

72 m² · 775 sq ft

Modules: 4

Finish: Metal cassette cladding

Use: Office

Location: Royston, Hertfordshire

Date: 2025

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

Cappagh Browne Utilities — Workspace 72

12.0 m × 6.0 m · 39 ft × 20 ft

72 m² · 775 sq ft

Modules: 4

Finish: Metal cassette cladding

Use: Office

Location: Eastleigh

Date: 2025

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

Stacey Processing Ltd — Workspace 72

12.0 m × 6.0 m · 39 ft × 20 ft

72 m² · 775 sq ft

Modules: 4

Finish: Metal cassette cladding

Use: Office

Location: Matlock, Derbyshire

Date: 2025

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

The Priory Lincoln Academy — Andrew

5.0 m × 2.5 m · 16 ft × 8 ft

12.5 m² · 135 sq ft

Modules: 1

Finish: Timber-effect steel lamella cladding

Use: Grab-and-go food service

Location: Lincoln

Date: July 2025

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

St Mark’s Church of England School — Amber

4.0 m × 2.5 m · 13 ft × 8 ft

10 m² · 108 sq ft

Modules: 1

Finish: Graphite steel with horizontal timber-effect lamellas

Use: Additional
school food service point

Location: Shirley, Southampton

Date: May 2025

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

Snaith Primary School — Charles

4.0 m × 2.5 m · 13 ft × 8 ft

10 m² · 108 sq ft

Modules: 1

Finish: Graphite steel with timber-effect lamella inserts

Use: School food service

Location: East Yorkshire

Date: August 2025

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

Sentry Self Storage — Drake

8.0 m × 3.0 m · 26 ft × 10 ft

240 m² · 260 sq ft

Modules: 1

Finish: Graphite steel cassette cladding with red brand accent

Use: Branch office, customer reception and staff welfare

Location: Devon

Date: September 2026

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

Aviation Park Group — Caroline

10.0 m × 3.0 m · 33 ft × 10 ft

30 m² · 330 sq ft

Modules: 1

Finish: Graphite steel cassette cladding with white detailing

Use: Passenger waiting room / small terminal

Location: Hawarden Airport, Chester

Date: November 2024

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

JCB — George

6.0 m × 3.0 m · 20 ft × 10 ft

18 m² · 200 sq ft

Modules: 1

Finish: Graphite steel cassette cladding with custom JCB yellow detailing

Use: Trade show office, meeting room and product presentation space

Location: Farnham, Surrey

Date: 2024

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

Nationwide Logistics Company — Karina

12.0 m × 6.0 m · 39 ft × 20 ft

72 m² · 800 sq ft

Modules: 4

Finish: Graphite steel cassette cladding with golden-oak timber-effect lamellas

Use: Logistics operations office

Location: UK site

Date: October 2025

Delivery & installation: Up to 8 weeks; assembled on site in 2 days

Cappagh Browne Utilities — Ethan

12.0 m × 9.0 m · 39 ft × 30 ft

108 m² · 1163 sq ft

Modules: 4

Finish: Graphite steel cassette cladding

Use: Offices, reception and staff welfare

Location: Isle of Wight

Date: August 2026

Delivery & installation: Up to 10 weeks; assembled on site in 2 days

The Mortgage Booth — Nora

6.0 m × 5.0 m · 20 ft × 16 ft

30 m² · 320 sq ft

Modules: 2

Finish: Graphite and silver steel cassette cladding with Winchester timber-effect inserts

Use: Mortgage brokerage office

Location: Lakeside Village, Doncaster

Date: November 2025

Delivery & installation: Up to 8 weeks; assembled on site in 1 day

Call Now Button